Tuesday, April 22, 2014

Incredibly Long Post of To-Do's


I’ve had a few posts outlining the whole 1st grade musical hullaballoo, but my camera battery decided it didn’t want to cooperate. I don’t want to post those without pictures because they will help illustrate the how-to process.  I’ve been waiting for the replacement but it seems as though the mail system has conspired with the battery gods to keep me waiting on picture downloads.  Until it arrives, I’ll be sans photos.  I had planned on writing a few things so I could keep to posting at least once a week but I’ve been enjoying a hiatus during my spring break.  It’s been wonderful!  I’ve loved being able to catch up on housework, organization and general home upkeep.  Next up on the to-do list is to come up with a general “To Do” list for the house.  Since there are so many things that we’d like to do, it’s a little overwhelming.  My mother-in-law had some fantastic advice of going one room at a time.  We have 10 rooms on the main floor (including 2 bathrooms) and every one of them needs some attention.  Some rooms need more than other L and there is a basement with 5 rooms (including 1 bathroom down there).  Unfortunately every room in the basement needs attention.  Fortunately the basement is not even on the list right now, it’s so far down.

Mud room (not an actual room)
  • remove table top like surface from alcove
  • add shelving to alcove
  • add hanging hooks to alcove
  • add hanging hooks between shelves
  • some sort of sitting structure between shelves
  • Paint room (including outside entry and garage entry)
  • purchase/make curtain for outside entry door
  • paint trim
  • artwork
  • wall calendar/organizations system

Half-bath/Laundry room
  • remove (or frame out) 80's-tastic wall sized mirror
  • replace 80's-tastic light fixutre
  • paint room
  • paint trim
  • replace faucet
  • purchase/make curtain to conceal laundry area
  • purchase/make curtain for window
  • new shelving/paint old shelving
  • artwork
  • add area rug
Kitchen 
  • paint cabinets
  • paint walls
  • paint trim
  • remove upper cabinets from south and east wall
  • add open shelving to south and east wall
  • replace cooktop
  • replace built-in oven
  • replace counter tops
  • add area rug
 
 Dining Room
  • paint walls
  • paint trim
  • paint built-in wet bar
  • replace counter top on wet bar
  • replace sink/faucet on wet bar
  • replace track lighting
  • replace light fixtures over bar and sconces
  • purchase make curtains for patio doors
  • art work
  • add area rug/door mat 

Formal Dining Room/Office
  • paint walls
  • paint trim
  • paint doors
  • paint desk
  • purchase/make curtains
  • add furniture (not sure what yet)

Entry Way
  • add artwork
  • replance lighting fixtures
  • retile

Living Room
  • paint walls
  • paint trim
  • paint doors
  • replace ceiling fan
  • add sofa table ?
  • add coffee table ?
  • add area rug
  • replace track lighting

A’s Bedroom
  • paint walls
  • replace ceiling fan
  • add dresser
  • add desk
  • replace curtains
  • replace area
  • replace area rug
  • paint headboard
  • add artwork

Guest Room
  • paint trim
  • replace ceiling fan
  • add bed
  • add area rug
  • add artwork

Jack & Jill Bath (between A’s room and Guest Room)
  • paint walls
  • paint trim
  • paint vanity
  • replace counter top
  • replace faucets (there are two sinks)
  • replace fan
  • tile shower
  • replace shower doors
  • tile floor (part is already tiled and part is carpeted)

Master Bedroom
  • paint trim
  • replace ceiling fan
  • replace lighting
  • add area rug
  • new dresser
  • new nightstand(s)
  • add artwork

Master Bath
  • remove 80's-tastic mirrors and replace with larger individual mirrors for both vanities
  • remove 80's-tastic lighting from above mirrors
  • paint vanities
  • replace countertops for vanities
  • replace faucets for vanities
  • replace sinks ?
  • paint walls
  • paint trim
  • paint skylight
  • remove carpeting
  • tile floors
  • add board & batten to walls ?
  • remove step-up to the tub
  • paint tub
  • replace bathtub faucet
  • purchase/make curtains for windows & door
  • tile shower
  • replace showerhead

Master Closet (not a real room)
  • paint walls/ceiling
  • replace lighting
  • reorganize shelving/rods
  • remove carpet?

Friday, April 4, 2014

Gettin-er-Done


In the spirit of gettin-er-doneness, I’ve finally finished with hyena costumes and spring musicals are in the rearview mirror.  This week has definitely been a whirlwind but it’s thisclose to being over.  Here is a little snapshot of the finished product.  I wish this shot would’ve included the tail, but it doesn’t so bummer… For safety (and because I’m not 100% sure about showing pics of the boy), I’ve added the “black bar” to cover a good portion of his face.  The black bar reminds me of a Us Weekly hot or not column.

 
 
Hmmm...if only the mess in the TV room would clean itself.